# Response to reviewers — round 5 (housekeeping) Round-4 reviews received against `2da0a79`: the Claude reviewer ("Round 4 is the cleanest round this corpus has had… Nothing blocks the freeze; no remaining findings on the corpus itself") and GPT-5.6 ("Approve after minor documentation fixes", scoped-attestation condition). No theorem, proof, or Lean surface changed this round — this is the documentation-and-guardrails round both reviewers asked for. ## Disposition ### Stale counts, third recurrence (Claude R4-1/R4-2 = GPT §6) — fixed STRUCTURALLY All `218/59` occurrences are now `222/61` (STATEMENT-MAP footer, the check.sh comment, README status), and — the structural part R4-1 demanded — **check.sh gained Phase 3c (doc-consistency)**: the audit counts in STATEMENT-MAP and README are asserted against the allowlist and the CONES table, and the four fidelity pins quoted in the STATEMENT-MAP are asserted against the harness's own pinned constants, on every button press. Stale-count drift is now a red button, not an erratum. README status paragraph rewritten to round-4 reality (lied-size family, `acceptCons_sound`, both approvals); the L6b row names `acceptCons_sound`. ### The deployment bridge (GPT §2/§3/§4, its principal finding) — adopted in full - **Gap 14 reworded** to GPT's evidence-vs-inference formulation: the exhibited divergence is outside the intended pin-store input invariant; applying the mechanized soundness result to the deployed flow additionally ASSUMES the authentic-size/root binding — "is assumed", not "transfers". The invariant's witnesses are now cited by name (paper §5.3/§5.4; pacta `src/pacta/sthstore.py`, `src/pacta/logclient.py` — outside the fidelity target), per Claude R4-3. - **New gap 15**: "Deployment refinement invariant unmechanized" — the bridge gets its own named boundary, with the unproven refinement spelled out and the three closure paths (adopt ConsRec semantics in deployment / mechanize the state machine and prove refinement / keep the scoped claim) recorded as a post-paper-freeze operator decision. - **Attestation language is now a runbook GATE**: the exact scoped wording from GPT §11 is embedded in ATTESTATION-RUNBOOK step B2 as a required check — entry 13 cannot be written as "the deployed verifier is formally verified." ### Toolchain enforcement (GPT §5) — fixed `run_bare.sh` now fail-closes on both the Lean version (`4.30.0-rc2`) and the exact compiler commit (`3dc1a088…`); `BARE RUN GREEN` is reserved for the pinned toolchain, exactly as recommended. ### Banner wording (GPT §8) — adopted The per-family line now reads `consistency baseline family: … all agree`, so a detached quotation cannot suggest global equivalence. ### Fidelity-target provenance (GPT §7) — REFUTED, with a courtesy fix The round-4 target tarball demonstrably contains `MANIFEST.sha256` (six per-file SHA-256 entries) and `TARGET-PROVENANCE.md` (repo URL, pinned commit `3d81d53`, verification instructions, extraction and run commands) at its root — `tar tzf` lists both. The review appears to have counted only the `.py` files. No packaging change was required; as a courtesy, the round-5 kit ALSO ships both files unpacked beside the tarball so they cannot be missed. (The project's discipline cuts both ways: reviewer findings are re-verified too, and this one did not reproduce.) ### Wording nit (Claude R4-5) — adopted Gap 14 now says "lied new size at fixed offsets n−1/n+1/n+7" — determinism advertised, not obscured. ### Paper queue (Claude R4-4 + GPT §11) — recorded Added to the camera-ready queue: §10(v) "total correctness of the pin-store state machine" must be scoped to what gaps 4/7/10 delimit; Remark 1's "will carry" must get the gap-3 specializations rewording when the corpus is cited as delivered; and the paper may not describe Theorem 3 as mechanized "for the deployed verifier" without the gap-15 qualification. ## What did NOT change Every Lean file, the allowlist, the gate, the self-test, the fidelity pins (230,271 / 230,016 / 73,573 / 3,867), the axiom boundary, the live log (12 leaves, `bcd15f9d…`), deployed pacta. Attestation remains gated on the ePrint decision, the operator's read (A2), the rehearsal (A4), and an explicit operator order — with the B2 scope wording now part of the gate.